You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Saluran Phb Taman Ratu Sudah 70 Persen

Taman Ratu PHB Channel Dredging Process Reaches 70 Percent

Dredging process of Taman Ratu connecting (PHB) channel reaches 70 percent. Mud was filled the channel thus it is dredged.

This week is expected to be done. Dredging is done to prevent inundation around Taman Ratu area

West Jakarta Water Resources Sub-dept. Head, Imron said, that 2-kilometers long connecting channel was filled by mud as high as 2 meters.

"Dredging is started since 2 weeks ago. Recently, the progress reaches 70 percent," he said, Tuesday (7/25).

Puddle in Taman Ratu Complex Receded Gradually

He added, one heavy equipment, six trucks and eight personnel are deployed. This work is targeted to finish in this week.

"This week is expected to be done. Dredging is done to prevent inundation around Taman Ratu area," he closed.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1373 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1034 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye960 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye835 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye734 personAldi Geri Lumban Tobing